© 2005–2026 ПАО НК «РуссНефть»

For OLYMPian calm

“Orsknefteorgsintez” started to use the plant “Olymp-2002” at its treatment facilities. The automated system neutralizes chlorine in case of excessive discharges by 99/8%, i.e. almost completely. This event is of great importance for the whole city, for it has historically come round that the plant named after Chkalov, at present a subsidiary of “RussNeft” delivers only 10% of drains, but purifies practically all the water in Orsk.
12.07.2007 “Orskaya Khronica”

“Saratovneftegas” help to arrange summer holidays for children

Recreation camps for children go on functioning. During the first shift 881 children enjoyed the services of municipal recreation camps and 1580 children spent a month in departamental camps. In total this summer 70 recreational institutions in the region are going to receive more than 40 thousand children.
10.07.2007 "Broadcasting station “Echo Mockvy” in Saratov"

In the first half-year “Orsknefteorgsintez” built refining 11% up.

Orenburg, July 6, INTERFAX – OAO “Orsknefteorsintez” (Orenburg region, a subsidiary of OAO “Oil and Gas Company “RussNeft”) in January – June of 2007 processed 2 422 million tons of oil stock, 11% more than the figure of the analogous period in the year 2006, “Interfax” was informed by the press-service of the company.
06.07.2007 "Interfax"

“Saratovneftegas” completed reconstruction of tubing repair site.

Nowadays the cost of any tubing, including oilwell tubing used in oil and gas industry, is very high. For this reasons many plants prefer to repair existing tubing rather than to buy new one. In 2006 ZAO “Service-Center NP & BO” (a subsidiary of OAO “Saratovneftegas”) reconstructed and put into operation a tubing repair site. But until recently there was no possibility to perform all the operations of the technological process at the site.
06.07.2007 "Saratovbusinessconsultiong"

The oilmen of Udmurtia learned to use associated gas.

Sosnovskoye Oilfield of OAO “Belkamneft”, a subsidiary of OAO NK “RussNeft”, has summed up the results of putting into operation a multiphase pumping station ROSSCOR. Introduction of the new equipment permitted to use associated gas in the technological process of oil treatment at the oil-heating unit “Chernovskoye” and at the boiling room. Before that the boiling room of the oil treatment block burned imported oil.
04.07.2007 “Moya Udmirtia”