© 2005–2026 ПАО НК «РуссНефть»

OAO Ulyanovskneft commissioned a new water pressure pipeline

13.09.2012 "Komsomolskaya Pravda Ulyanovsk"

Ulyanovsk. OAO NK RussNeft subsidiary OAO Ulyanovskneft continues to increase process equipment reliability of Ulyanovsk field block.

In particular high-pressure water pipeline for produced water injection into reservoirs pressure maintenance wells of Philippovskoe field has been restored. 114 mm OD 1 km steel pipeline has been replaced with a same size fiber-glass pipeline. It decreased the differential pressure across the pipeline from the pipe header to reservoir pressure maintenance wells and therefore increased the produced water injection from 112 up to 120 cm.
As a result of the activities performed the modular compressor station productivity has increased. Apart from that, reliability and accident-free operation of this technical equipment let reduce the negative impact on environment.

More news

All Show all

RussNeft Announces Support for Regional Social Development

PJSC “RussNeft” continues to assist educational institutions serving children with disabilities.

RussMeft Supports Sports Tournaments in the Regions

PJSC “RussNeft” continues to support regional sports initiatives. In the Khanty-Mansi Autonomous Okrug – Yugra, the Company supported the Open Boxing Championship for the Nizhnevartovsky District Head’s Cup.

RussNeft announces the release of 2,417 sterlet fingerlings into the Volgograd Reservoi

The company's press service has announced the restocking of the Volgograd Reservoir (Volga River), with 2,417 fish fingerlings.