© 2005–2026 ПАО НК «РуссНефть»

OAO Ulyanovskneft claims to implement 2014 drilling programme

24.01.2014 Neftegaz.ru

Ulyanovsk. OAO Ulyanovskneft, a subsidiary of OAO NK RussNeft, according to the 2014 drilling programme, commissioned well №27 at Kudryashovskoe oilfield with a current debit of 60 tons a day. Well’s exploration started 1 month ahead the schedule. At the moment well №28 is being drilled at the oilfield.

Kudryashovskoe oilfield was discovered in 1985 and brought into development in 1998. The operating well stock equals to 8 wells. In 2013 the oil production reached 38 872 tons. In 2014 three exploitation wells are to be drilled at Kudryashovskoe oilfield.

In total the 2014 drilling programme of OAO Ulyanovskneft envisages 12 new wells.According to preliminary estimates these measures will assure the company 59,140 tons of oil production gain.

More news

All Show all

RussNeft names winners of the 3rd Scientific and Technical Conference for Young Professionals

The professional panel of PJSC “RussNeft” has decided the winners of the Company`s Scientific and Technical Conference for Young Professionals.

RussNeft continues to implement educational projects for schoolchildren

PJSC “RussNeft” continues to implement educational projects. According to the company`s press service, schoolchildren from the regions where the company`s enterprises operate took part in an educational project implemented by the Company jointly with the Gubkin Russian Oil and Gas University since 2010.

RussNeft sums up the optimization program results

The key areas of the new initiatives are well repair, energy efficiency, industrial safety, and oil and gas transportation.