© 2005–2026 ПАО НК «РуссНефть»

Aganneftegazgeologiya prepares for drilling on Roslavlskoye field

27.04.2012 “UralInformBureau”

Nizhnevartovks region, KhMAO. OAO MPC Aganneftegazgeologiya commenced preparatory works for horizontal directional drilling on Pad 20 of Roslavlskoye field. The work is performed within the program for drilling of producing wells.

A drilling rig is being installed on the site; materials and equipment required for the well construction are delivered.

Commencement of the well No 1098 drilling is scheduled for the second decade of May. Its depth is designed to be 3,498 m, the length of the horizontal section will be 500 m. BV8-1 horizon will be penetrated by drilling, press service of OAO MPC ANGG informs.

Roslavlskoye field has been under commercial development since 2000, its operation stock is 50 oil producing wells. Commissioning of a new well will allow Aganneftegazgeologiya to stabilize the volumes of the produced oil and increase the performance indicators.

More news

All Show all

RussNeft reports on its chemical analysis laboratory competence confirmation with RusAccreditation.

PJSC “RussNeft” issued a press release announcing the completion of a series of activities to certify the competence of its Ulyanovsk branch`s chemical analysis laboratory with the Federal Accreditation Service.

RussNeft names winners of the 3rd Scientific and Technical Conference for Young Professionals

The professional panel of PJSC “RussNeft” has decided the winners of the Company`s Scientific and Technical Conference for Young Professionals.

RussNeft continues to implement educational projects for schoolchildren

PJSC “RussNeft” continues to implement educational projects. According to the company`s press service, schoolchildren from the regions where the company`s enterprises operate took part in an educational project implemented by the Company jointly with the Gubkin Russian Oil and Gas University since 2010.