© 2005–2026 ПАО НК «РуссНефть»

Ulyanovsk oilmen changed the manufacturing scheme of the reservoir pressure maintenance system at Verkhozimskoye oilfield.

04.05.2010 IA “Mozaika”

Ulyanovsk. OAO “Ulyanovskneft”, a subsidiary of OAO NK “Russneft”, changed the manufacturing scheme of the reservoir pressure maintenance system and formation water utilization at Verkhozimskoye oilfield.

In the first place looping underlay (the second run) of the flow passage on formation water utilization was carried out, that permitted to increase the volume of the transported formation water. Flow separation at group pumping station by way of remanifolding of industrial pipe-lines (pressure pipe header) provided an opportunity to regulate the productivity of each pump and redistribute optimal pressure in the flow passage system.
Improvement of the reservoir pressure maintenance system allowed OAO “Ulyanovskneft” oilmen to create conditions for increasing the base oil production at Verkhozimskoye oilfield.

More news

All Show all

RussNeft shared details about social and environmental initiatives in the regions of its operation

The company's press service reported that, together with the administration of the Nizhnevartovsky district of the Khanty-Mansi Autonomous Okrug - Yugra, an annual agreement on socio-economic cooperation was concluded.

RussNeft speaks about its work on personnel training

Qualified specialists are the basis for technological development and economic growth in the country. Professionals and masters of their craft are the driving force behind enterprises in all sectors of the economy.

Russneft reports on river restocking in the Khanty-Mansi Autonomous Okrug

The company's press service announced the completion of efforts to replenish the fish resources of the Ob River basin. A total of 80.5 thousand nelma and muksun fingerlings were released.